翻訳と辞書
Words near each other
・ Astan Dabo
・ Astan Quds Razavi
・ Astan-e Karud
・ Astana
・ Astana (disambiguation)
・ Astana (radio)
・ Astana Arena
・ Astana Cemetery
・ Astana Continental Team
・ Astana Cup
・ Astana Dakar Team
・ Astana Economic Forum
・ Astana Gede inscription
・ Astana Giribangun
・ Astana International Airport
Astana Light Metro
・ Astana Opera
・ Astana Presidential Sports Club
・ Astana Pro Team
・ Astana Tigers
・ Astana TV
・ Astana-Acca Due O
・ Astand-e Jadid
・ Astaneh
・ Astaneh Rural District
・ Astaneh Rural District (Markazi Province)
・ Astaneh Rural District (Razavi Khorasan Province)
・ Astaneh Sar
・ Astaneh, Anbarabad
・ Astaneh, Ardestan


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Astana Light Metro : ウィキペディア英語版
Astana Light Metro
The Astana Metro is a planned light rail rapid transit system located in Astana, Kazakhstan, which is the capital of the country with a population of about 750,000. Construction should have finished roughly about the same time as the Almaty Metro, which was estimated for 2010. However, completion has been postponed until 2017.〔http://tengrinews.kz/kazakhstan_news/okolo-50-legkorelsovyih-tramvaev-planiruyut-zapustit-v-astane-k-EXPO-2017-225113/〕 Project authority Astana LRT LLP had signed an agreement with a consortium of China Railway International Group and Beijing State-Owned Assets Management Co for construction of the first phase of the capital’s light rail project on May 7 2015.〔http://www.railwaygazette.com/news/news/asia/single-view/view/astana-light-rail-framework-agreement-signed.html〕
The light metro is part of Nazarbayev's Kazakhstan 2030 economic plan to transform Kazakhstan into an economic power. A great deal of construction has taken place in Astana since it became the capital in 1997.
==Line 1==

The 22·4 km North-South route would link the city’s main line station with Astana International Airport. The alignment of this line is partly segregated and partly on-street. The line will have 18 stops and one depot. Services would be operated by 19 vehicles with a maximum operational speed of 40 km/h. Ridership is expected to be 83 000 passengers/day and the line is planned to open in time for Expo 2017.


抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Astana Light Metro」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.